KRYSS
Kraft Reinforcement Yarn Spinning System
ENGINEERING DOCUMENT CONTROL
REGISTER SNAPSHOT
Current archive / recovered pre-incident index

Technical Document Register

Snapshot: 21 December 2018   |   Working index

This recovered register copy predates the 2019 stability programme. It is retained because several document references survived only through older index copies.

CodeTitleRevisionClass
TN 14-01Fibre Conditioning - Initial Bench ProcedureRev BARCHIVE
DR 14-03Bench Forming Sketch SetRev ADRAWING
TN 15-02Wet Ribbon Formation TrialsRev CTECH NOTE
DR 15-05Drainage Plate GeometryRev BDRAWING
TN 16-03K-80 Process NotesRev DTECH NOTE
ME 16-07K-80 Drive & Guide LayoutRev CMECH
ER 17-02Tension Drying Rack - Engineering RecordRev BENG RECORD
TR 17-06K-120 Draw StabilityRev ATEST REPORT
CAL 17-09Load Cell Calibration RecordRev FCALIBRATION
TR 18-04K-140 Pilot Line OverviewRev CTEST REPORT
TR 18-07Moisture Sensitivity - Conditioned Sample SeriesRev BTEST REPORT
QC 18-09Test Methods - Pilot Sample CharacterisationRev EQC
Historical register copy. Some documents listed above were not present in the final 2020 recovered archive.

Plain-text register copy · CSV register copy

Return to final archive register →